CCLI Activity log does not include 04/01/2010 - 09/30/2010 report date range

4/5/2010
Symptoms:
The reporting period of 04/01/2010 - 09/30/2010  for the CCLI Activity log is missing from the drop down in the log activity. 

Possible Cause:
The 10/21 and 2/26 builds did not include this date range.

Possible Solution:
This will be corrected in the March 2010 release.